University Hospital Koge

New University Hospital Koge

The University Hospital in Koge, which is targeted for completion by 2022, will be Region Zealand’s main hospital. The project came about as a result of the vision to create consistency in patient treatment.



The University Hospital in Koge, which is targeted for completion by 2022, will be Region Zealand’s main hospital. The project came about as a result of the vision to create consistency in patient treatment.



The hospital will be the acute hospital for a catchment area of about 290,000 people, representing one-third of the regional population. The hospital will provide the most specialized treatment for the entire region and will carry out research and teaching activities at a high level.

The hospital uses technology and methods based on the latest principles of treatment. As part of the hospitalization time, focus is on teaching the patient to manage their condition themselves. Patients have single bedrooms  with private shower and toilet. Single bedrooms  can be adapted to the individual  needs and so that the patient gets as many options for personalization as possible.

In general, the University Hospital in Køge will adapt flexibly to meet medical needs long into the future, while supporting collaboration across both specialties and professions.

Logistics, transportation, cleaning and equipment will all be integrated to support the clinical staff so that they are able to spend the maximum amount of time with the patients.

University Hospital  Koge will have 830 beds.


Key figures

Project period:

2011 - 2022

Project cost:

4.0 bn DKK (09 PL)

 

Funded by:

Quality Foundation and Region Zealand


View facts

Business Opportunities

Project advisers have been selected.

The project is of interest to contractors and suppliers within the areas of unfinished buildings, finishes, fixtures and equipment.



Coming tenders

  • The total skilled labour costs are estimated at 2.22 billion DKK
  • The provision of car parks and roads is scheduled for 2016
  • Phased provision of demolition and construction from 2017
  • Tenders for equipment supplies, medical technology and furniture from 2017


Scope of project

  • 142,000 m2 of new buildings
  • 54,000 m2 of existing hospital
  • 16,400 m2 demolition
  • 7,500 m2 conversion
  • 1,950 parking spaces

 Employees: 4,000 in 2022 (current number: 1,600)

Contractor Advisor: Bascon A/S

Chief Adviser: C.F. Moller with Alectia A/S and Ramboll Denmark A/S as consortium members

Sub-Advisers: Søren Jensen Engineering Consultants A/S, Cubo Architects A/S and Gehl Architects Aps

Location

Lykkebækvej 1, 4600 Køge

Links

www.regionsjaelland.dk/koege2020
www.facebook.com/usk2020  













Contact

Helle Gaub, Project Director
Email: hcg@regionsjaelland.dk
Tel.: +45 24 96 97 34


Jacob Saxild, Copenhagen Capacity

Jacob Saxild

Development Manager

Direct: 0045 33 26 87 68

Mobile: 0045 28 83 94 96




More information